Market Activities
To date, we have no information about market activities in 2025
Jan 2019
Sold
Apr 2018
Sold
Oct 2017
Recent Rent
Sep 2016
Sold
Building Permits
To date, we have no information about building permits in 2025
Sep 14, 2015
Description: Project: kapalua bay villas - bldg 25 now occupied as: apartment bldg to be occupied as: apartment bldg scope: repair roof overhang only dimensions: special inspection required items #14 & 15 by wade garlin ....591-2728
- Parcel #: 2420010240000
- Permit #: B 20151207
Sep 14, 2015
Description: Project: kapalua bay villas - bldg 26 now occupied as: apartment bldg to be occupied as: apartment bldg scope: repair roof overhang only dimensions: special inspection required items # 14 & 15 by wade garlin .... 591-2728
- Parcel #: 2420010240000
- Permit #: B 20151208
Aug 20, 2014
Description: Project: kapalua bay villas - building #33. now occupied as: apartment to be occupied as: apartment. scope: apartment repair: roof repair (overhang portion only).
- Contractor: Lucas H Sutherland
- Parcel #: 2420010240000
- Permit #: B 20141089
Aug 20, 2014
Description: Project: kapalua bay villas - building #30. now occupied as: apartment to be occupied as: apartment. scope: apartment repair: roof repair (overhang portion only).
- Contractor: Lucas H Sutherland
- Parcel #: 2420010240000
- Permit #: B 20141088
Sep 16, 2013
Description: Project: kapalua bay villas - building #22. now occupied as: apartment to be occupied as: apartment. scope: apartment repair: roof repair (re-roof portion). portion of two-story roof repairs concrete roof tile. batten sealant grout felt underlayment flashing waterproof membrane facial & edge trim plywood veneer @ rafter tails. (m. tanaka 7/3/2013) sir required for items #14 & #15.
- Contractor: Mdl Building
- Parcel #: 2420010240000
- Permit #: B 20131007
Sep 16, 2013
Description: Project: kapalua bay villas - apartment building #21. now occupied as: apartment to be occupied as: apartment. scope: apartment repair: roof repair (re-roof portion only). portion of two-story roof repairs concrete roof tile. batten sealant grout felt underlayment flashing waterproof membrane facial & edge trim plywood veneer @ rafter tails. (m. tanaka 7/3/2013) sir required for items #14 & #15.
- Contractor: Mdl Building
- Parcel #: 2420010240000
- Permit #: B 20131006
Aug 17, 2009
Description: Project: kapalua bay villas. now occupied as:apartment building 29. to be occupied as:apartment building 29 - repairing roof over hang. retrofit framing at mid-roof (3rd flr) and high roof: eave repair - hurricane resistance upgrade (clips fasteners blocking fascia bands). repair/replace rafters rakes supporting members. replace w/new fascia configuration replace eave withnew structural retrofit and roof attachment (built-up rafter tails). **8/6/09 - no previous co found**jf. no special inspection required.
- Contractor: Bernhard Wonneberger
- Parcel #: 2420010240000
- Permit #: B 20090944
Aug 17, 2009
Description: Project: kapalua bay villas. now occupied as:apartment building 28. to be occupied as:apartment building 28 - repairing roof over hang. retrofit framing at mid-roof (3rd flr): eave repair - repair/replace rafters rakes supporting members. retrofit framing at high roof: eave repair - hurricane resistance upgrade (clips fasteners blocking fascia bands) repair/replace rafters rakes supporting members. replace w/new fascia configuration replace eave with new structural retrofit and roof attachment (built-up rafter tails). **8/6/09 - no previous co found**jf. no special inspection required.
- Contractor: Bernhard Wonneberger
- Parcel #: 2420010240000
- Permit #: B 20090943
Aug 17, 2009
Description: Project: kapalua bay villas. now occupied as:apartment building 27. to be occupied as:apartment building 27 - repairing roof over hang. retrofit framing at low roof (2nd flr): eave repair - hurricane resistance upgrade (clips fasteners blocking fascia bands) repair/replace rafters rakes supporting members. retrofit framing at mid-roof (3rd flr) and high roof: eave repair - hurricane resistance upgrade (clips fasteners blocking fascia bands) repair/replace rafters rakes supporting members. replace w/new fascia configuration replace eave with new structural retrofit and roof attachment (built-up rafter tails). **8/6/09 - no previous co found**jf. no special inspection required.
- Contractor: Bernhard Wonneberger
- Parcel #: 2420010240000
- Permit #: B 20090942
Dec 17, 2008
Description: Project: kapalua bay villas. now occupied as:apartment building 27. to be occupied as:apartment building 27 - repairing roof over hang. retrofit framing at low roof (2nd flr): eave repair - hurricane resistance upgrade (clips fasteners blocking fascia bands) repair/replace rafters rakes supporting members. retrofit framing at mid-roof (3rd flr) and high roof: eave repair - hurricane resistance upgrade (clips fasteners blocking fascia bands) repair/replace rafters rakes supporting members. replace w/new fascia configuration replace eave with new structural retrofit and roof attachment (built-up rafter tails).
- Contractor: Bernhard Wonneberger
- Parcel #: 2420010240000
- Permit #: SM5 20080362
Nov 25, 2008
Description: Project: kapalua bay villas. now occupied as:apartment building 27. to be occupied as:apartment building 27 - repairing roof over hang. retrofit framing at low roof (2nd flr): eave repair - hurricane resistance upgrade (clips fasteners blocking fascia bands) repair/replace rafters rakes supporting members. retrofit framing at mid-roof (3rd flr) and high roof: eave repair - hurricane resistance upgrade (clips fasteners blocking fascia bands) repair/replace rafters rakes supporting members. replace w/new fascia configuration replace eave with new structural retrofit and roof attachment (built-up rafter tails).
- Contractor: Bernhard Wonneberger
- Parcel #: 2420010240000
- Permit #: SMX 20080517
Jan 12, 2007
Description: Project: mauritson linda. now occupied as:apartment. to be occupied as:apartment - interior alteration to bathroom and kitchen. dimensions:. walls:wood studs partitions:wood studs foundation:e floors:conc/stone roof:e ceiling:gyp bd basement: na. plumbing scope of work: kapalua bay villas unit 18g2. 1 basins 1 bath tubs 1 for installation-alteration or repair of water piping and/or water treating equipment 1 builidng sewer to present sewer.
- Parcel #: 2420010240035
- Permit #: P 20070070
Nov 27, 2006
Description: Project: mauritson linda/kapalua bay villas.apt alt: interior alteration to bathroom and kitchen on apt. # 18g12. scope: 15 receptacles 24 switches 119 fixtures 2 exhaust fans 1 disposal 1 range hood 1 dishwasher 2 oven 1 water heater 1 range 1 dryer.
- Contractor: James E Hartsell
- Parcel #: 2420010240035
- Permit #: E 20064020
Oct 24, 2006
Description: Project: mauritson linda. now occupied as:apartment. to be occupied as:apartment - interior alteration to bathroom and kitchen. dimensions:. walls:wood studs partitions:wood studs foundation:e floors:conc/stone roof:e ceiling:gyp bd basement: na.
- Parcel #: 2420010240035
- Permit #: B 20062335
Feb 14, 2005
Description: Project: n. michael d. levin etal.apt renovation to include replacing circuilar stairway; convert bedroom loft to bedroom and increasing bedroom floor area by covering opening over living room unit 33 b3 4. scope: 12 receptacles 6 switches 15 fixtures 1 range 1 dryer 2 bathroom jacuzzi tubs. =============================================================================================== 05/03/13 - per greg nakao - r/c and final can be done with a miscellaneous inspection - advise homeowner that someone will need to open panels plates for inspector - cnf.
- Parcel #: 2420010240115
- Permit #: E 20050445
Jan 20, 2005
Description: Project: levin michael. now occupied as: apartment - kapalua bay villas unit 33 b34. to be occupied as: apt renovation to incl replacing circular stairway; convert bedrm loft to bedrm and increasing bedrm flr area by covering opening over living rm. dimensions:. walls: cmu 2x4 partitions:2x4 foundation:existing floors:wood roof:existing ceiling:gyp board basement: n/a.
- Contractor: Kimmey Unabia Architects, Ltd.
- Parcel #: 2420010240115
- Permit #: B 20050131
Bay Dr Fire Incident History
To date, we have no information about fire incidents in 2025
04 May 2017
Grass fire
Property Use —
Vehicle parking area
Area of Origin —
Highway, parking lot, street: on or near
First Ignition —
Light vegetation - not crop, including grass
Heat Source —
Radiated, conducted heat from operating equipment
25 May 2016
Fire, other
Property Use —
Vehicle parking area
Area of Origin —
Other
First Ignition —
Organic materials, other
Heat Source —
Heat from powered equipment, other
20 Sep 2009
Building fires
Property Use —
Athletic/health club
Area of Origin —
Personal service area, barber/beauty salon area
First Ignition —
Floor covering or rug/carpet/mat
Heat Source —
Spark, ember or flame from operating equipment
17 Aug 2009
Cooking fire, confined to container
Property Use —
Hotel/motel, commercial
Area of Origin —
Cooking area, kitchen
First Ignition —
Cooking materials, including edible materials
Heat Source —
Heat from powered equipment, other
Bay Dr Incidents registered in FEMA
(Federal Emergency Management Agency)
To date, we have no information about incidents registered in FEMA in 2025
11 Mar 2006
Chemical hazard (no spill or leak)
Property Use —
Laundry, dry cleaning
06 Dec 2003
Search for person on land
Property Use —
Beach
28 Nov 2003
Surf rescue
Property Use —
Beach
26 Nov 2003
System malfunction, other
Property Use —
Mercantile, business, other
Properties Nearby
Street Address | Residens/Landlords | |
---|---|---|
1 Bay Dr, Lahaina, HI 96761-9035 Condo
|
Beach Activities of Maui, Inc, BLAZEMASTER FIRE PROTECTION | |
Daniel J Danrich, Craig Ramsey | ||
Maui Land & Pineapple Co Inc |