Building Permits
To date, we have no information about building permits in 2025
Oct 20, 2004
Description: 10/20/2004-repipe mens rest main level-$3000.00 per initial cert of value-cmc//received fn value $3446/5/3/05/mls
- Valuation: $344,600
- Fee: $98.81 paid to City of Boise, Idaho
- Parcel #: R1013005845
- Permit #: PLM04-03115
Oct 8, 2004
Description: 10/7/2004-gas to gas change out (remodel) $3,500.00 per initital cert of value-cmc
- Valuation: $350,000
- Fee: $99.98 paid to City of Boise, Idaho
- Parcel #: R1013005845
- Permit #: MEC04-02753
Sep 29, 2004
Description: Install outlets, switches & lights per initial cert of value $6,000///9/29/04 bas//received fn value of $12,283/mls/4/18/05
- Valuation: $1,228,300
- Fee: $221.06 paid to City of Boise, Idaho
- Parcel #: R1013005845
- Permit #: ELE04-02984
Mar 2, 2004
Description: (derr building) (10-11-04) modified drawings were submitted showing the two mezzanine areas (250 square feet and 150 square feet) connected by a 170 square foot walkway. instead of each separate mezzanine area being served by its own stairway, the new walkway connects the two areas to a single stairway. only one stairway will be provided to serve both mezzanine areas. the new mezzanine area will be 570 square feet (increased by 170 square feet). this increases the fire area on the 1st floor to 2,940 square feet. both mezzanine rooms will be offices. neither room is approved as a conference room. neither room is required to be open to the 1st floor because the occupant load is less than 10. the total 1st floor occupant load, including the mezzanine, will be 27. (4-16-04) modified drawings were submitted april 15, 2004 changing the transfer of structural loads. the modified drawings were approved april 16, 2006. (2-20-04) this building is not fire sprinklered. to construct two mezzanines (a 250 square foot conference area and a 150 square foot office area) on the 1st story of an existing building. this building has a 2,370 square foot 1st floor and a 2,237 square foot basement. the mezzanines will increase the fire area of the 1st floor to 2,770 square feet. work is to include footings, columns, beams, floor joists, floor sheathing, gypsum board shear walls, and stairways all per the approved drawings and the plan review report on file. a restroom on the 1st floor is being altered to be accessible to the disabled. also, an exterior concrete ramp is being provided to serve the 1st floor. **cjw
- Contractor: Community Contracting Corp
- Valuation: $5,000,000
- Fee: $2,187.80 paid to City of Boise, Idaho
- Parcel #: R1013005845
- Permit #: BLD03-03048
May 22, 2000
Description: 5/22/00-$11,400.00-installation of 38 square feet of roof covering in accordance with chaper 15, table 15a-tear off existing layers shake roof, refelt and recover with shakes.-final cert. of value.mps
- Valuation: $1,140,000
- Fee: $179.38 paid to City of Boise, Idaho
- Parcel #: R1013005845
- Permit #: BLD00-01440
Franklin St Fire Incident History
To date, we have no information about fire incidents in 2025
28 Nov 2016
Building fires
Property Use —
1 or 2 family dwelling
Area of Origin —
Laundry area, wash house (laundry)
First Ignition —
Curtains, blinds, drapery, tapestry
Heat Source —
Hot or smoldering object, other
10 Nov 2013
Cooking fire, confined to container
Property Use —
Multifamily dwellings
Area of Origin —
Cooking area, kitchen
First Ignition —
Cooking materials, including edible materials
Heat Source —
Heat from powered equipment, other
13 Dec 2012
Cooking fire, confined to container
Property Use —
Multifamily dwellings
Area of Origin —
Cooking area, kitchen
First Ignition —
Cooking materials, including edible materials
Heat Source —
Heat from powered equipment, other
18 Oct 2010
Passenger vehicle fire
Property Use —
Vehicle parking area
Area of Origin —
Engine area, running gear, wheel area
First Ignition —
Electrical wire, cable insulation
Heat Source —
Arcing
817 Franklin incidents registered in FEMA
(Federal Emergency Management Agency)
To date, we have no information about incidents registered in FEMA in 2025
15 Jan 2001
Rescue, emergency medical call (EMS) call, other
Property Use —
Business office
Franklin St Incidents registered in FEMA
(Federal Emergency Management Agency)
To date, we have no information about incidents registered in FEMA in 2025
20 Apr 2015
Unauthorized burning
Property Use —
Graded and cared-for plots of land
11 Aug 2014
Electrical wiring/equipment problem, other
Property Use —
Residential board and care
31 Jan 2014
Hazardous condition, other
Property Use —
Multifamily dwellings
26 Dec 2013
Authorized controlled burning
Property Use —
1 or 2 family dwelling
Properties Nearby
Street Address | Residens/Landlords | |
---|---|---|
Cradle Point, Cradle Point Technologies | ||
Jane M Albin | ||
820 Franklin St, Boise, ID 83702-5530 High Rise |
D Aanestad, Diane L Aanestad | |
Darlene A Dague, Tad Dague | ||
B R Rakozy Trustee, B R Rakozy | ||
Pauline Dunkle | ||
Hiromi Ogata | ||
Kathy Navin | ||
Kathy Navin |