Building Permits
To date, we have no information about building permits in 2025
Oct 31, 2002
Description: Owner supplied equipment 328,748.00
- Contractor: Micron Technology
- Valuation: $32,874,800
- Parcel #: R3466000020
- Permit #: ELE02-03404
Nov 19, 2001
Description: This permit is to split from plm01-00342 all the value this value is 200,000.00.... lh
- Valuation: $20,000,000
- Fee: $4,162.77 paid to City of Boise, Idaho
- Parcel #: R3466000020
- Permit #: PLM01-03948
Nov 19, 2001
Description: Install scrubber duct drains per initial cert of value $3,950.00
- Contractor: Micron Technology
- Valuation: $395,000
- Fee: $104.54 paid to City of Boise, Idaho
- Parcel #: S1607120701
- Permit #: PLM01-03939
Sep 18, 2001
Description: Domestic water, sanitary sewer, storm drain piping $100,000 initial cert aml
- Valuation: $10,000,000
- Fee: $2,150.73 paid to City of Boise, Idaho
- Parcel #: R3466000020
- Permit #: PLM01-03194
Sep 18, 2001
Description: Glycol water chilled water steam, steam condensate. natural gas piping $452,766 initial cert aml
- Valuation: $45,276,600
- Fee: $9,395.03 paid to City of Boise, Idaho
- Parcel #: R3466000020
- Permit #: MEC01-02793
Sep 17, 2001
Description: 9/17/01/bldg 15 east hallway/remove and then replace the supply air and return aire grills for new asm 412 furnaces/initial cert of value $7,264/mls 10-5-01 final cert of value $ 1,257.00///dld
- Valuation: $852,100
- Fee: $199.15 paid to City of Boise, Idaho
- Parcel #: R3466000020
- Permit #: MEC01-02775
Aug 21, 2001
Description: 8/21/01//micron technology/install "3" ea. class i hoods & "1" ea class ii vapor hood in bld 36 kitchen/initial cert of value $46,000/mls
- Contractor: Micron Technology
- Valuation: $4,600,000
- Fee: $974.97 paid to City of Boise, Idaho
- Parcel #: R3466000020
- Permit #: MEC01-02487
Aug 14, 2001
Description: Install fire smoke dampers to hallway supply ducts bld17 .....per initial cert of value $ 7887.00
- Valuation: $788,700
- Fee: $186.03 paid to City of Boise, Idaho
- Parcel #: S1067212407
- Permit #: MEC01-02430
Jul 26, 2001
Description: 7/26/01-$18,731.00-natural gas piping-bldg #36 initial cert. of value.mps///final cert of value $18,731///4/7/04 bam
- Valuation: $1,873,100
- Fee: $410.50 paid to City of Boise, Idaho
- Parcel #: R3466000020
- Permit #: MEC01-02213
Jul 26, 2001
Description: 1st floor modify the supply and return hvac system install new zone wall above ceiling and below floor on west wall per final cert of value $35,225.00
- Valuation: $3,522,500
- Fee: $751.93 paid to City of Boise, Idaho
- Parcel #: R3466000020
- Permit #: MEC01-02212
May 18, 2001
Description: Wiring for 10 door holders and 9 smoke dampers... ajc 5-18-01 $3753 1-11-02 no additional value ///dld
- Valuation: $375,300
- Fee: $102.01 paid to City of Boise, Idaho
- Parcel #: R3466000020
- Permit #: ELE01-01634
Apr 23, 2001
Description: Iw waste system... $921,375 ajc 4-23-01 11/6-additional value of 1,276,041.00 total valus of 2,197,416.00 lh
- Valuation: $219,741,600
- Fee: $30,528.53 paid to City of Boise, Idaho
- Parcel #: R3466000020
- Permit #: PLM01-01236
Apr 10, 2001
Description: 4/10/01-$2390.00-bldg 25**install one new vav box and two new diffusers alter existing duct.initial cert. of value.mps **4/11/01**additional $373.00 for a total of $2,763.00-final cert. of value.mps
- Valuation: $276,300
- Fee: $79.96 paid to City of Boise, Idaho
- Parcel #: R3466000020
- Permit #: MEC01-01039
Mar 1, 2001
Description: Bldg #21 remodel for aq/aql $37,359.00 initial cert aml additional job value of $9,415.00 3/19/01 aml additional job value of $624.00 4/17/01 aml additional job value of $1,324.00 7/23/01 aml additional job value of $2,459.00 8/15/01 aml additional job value of $3,466.00 9/27/01 aml additional job value of $739.00 10/12/01 aml
- Valuation: $5,538,600
- Fee: $433.59 paid to City of Boise, Idaho
- Parcel #: R3466000020
- Permit #: ELE01-00629
Feb 27, 2001
Description: Installation of oil separator, water and drain lines for utility sink and parts washer contact: george karcher, pager 97990 $9627.00 initial cert aml
- Contractor: Micron Technology
- Valuation: $962,700
- Fee: $222.05 paid to City of Boise, Idaho
- Parcel #: R3466000020
- Permit #: PLM01-00477
Feb 14, 2001
Description: Fixtures, w & v water rain water leader per initial certificate of value $307,836.00//final cert $347,348.00
- Valuation: $34,734,800
- Fee: $6,394.98 paid to City of Boise, Idaho
- Parcel #: R3466000020
- Permit #: PLM01-00342
Feb 8, 2001
Description: Hvac per plans and specs in bld #36 ajc 2-8-01 $1,100,000///final cert of value $1,100,000///4/1/04 bam
- Valuation: $110,000,000
- Fee: $19,170.27 paid to City of Boise, Idaho
- Parcel #: R3466000020
- Permit #: MEC01-00385
Feb 8, 2001
Description: Micron--hvac per plans and specs building #36... ajc 2-8-01 $1,386,900///final cert of value $1,386,900///4/1/04 bam
- Valuation: $138,690,000
- Fee: $22,139.69 paid to City of Boise, Idaho
- Parcel #: R3466000020
- Permit #: MEC01-00384
Feb 6, 2001
Description: Bldg. 25 back fill maintenance and instrumentation shops $101.00 initial cert aml 11-29-01 final value
- Contractor: Micron Technology
- Fee: $33.14 paid to City of Boise, Idaho
- Parcel #: R3466000020
- Permit #: ELE01-00380
Feb 5, 2001
Description: 1/3/01//micron building #24/freight/bret miche/mortensen 383-4372/install one 5 stop schindler elevator and related electrical equipment/initial cert of value $4,250/mls
- Valuation: $425,000
- Fee: $107.16 paid to City of Boise, Idaho
- Parcel #: R3466000020
- Permit #: ELE01-00021
Jan 12, 2001
Description: Cafeteria new construction service fixtures outlets... ajc 1-12-01 $346,942
- Valuation: $34,694,200
- Fee: $1,942.39 paid to City of Boise, Idaho
- Parcel #: R3466000020
- Permit #: ELE01-00147
Jan 12, 2001
Description: Office building new construction service fixtures outlets... ajc $2,081,652 ajc 1-12-01 final additional value $ 307,476.00 5-28-02///dld
- Valuation: $238,912,800
- Fee: $12,510.71 paid to City of Boise, Idaho
- Parcel #: R3466000020
- Permit #: ELE01-00146
Jan 3, 2001
Description: 1/3/01//micron building #24/passenger/bret miche-mortenson 383-4372/install one 2-stop schindler elevator and related electrical equipment/initial cert of value $3,500/mls
- Valuation: $350,000
- Fee: $99.40 paid to City of Boise, Idaho
- Parcel #: R3466000020
- Permit #: ELE01-00020
Dec 21, 2000
Description: Micron building #25-backfill maintenance & instrument shops-(pcs 25-003718) to constuct new 8 foot high interior partitions, suspended ceiling, 8 foot high chain-link fence, mechanical ducts and plumbing piping to create a new 266 sq. ft., inspection shop #103c and a 767 sq. ft., tool crib area #104a. this permit is also for cutting the existing concrete slab and installing two new 12" deep reinforced concrete tool support slabs. one slab is approximately 14'x38' and the other is approximately 14'x53'. this work is being done on the first floor of building #25 between grid lines 4&8 and a&f. all construction per the approved plans on file. pc#1034-00/jcm
- Valuation: $3,691,100
- Fee: $778.94 paid to City of Boise, Idaho
- Parcel #: R3466000020
- Permit #: BLD00-03596
Dec 6, 2000
Description: Install gas piping in fab 1x no structural permit for this job $6002.00
- Contractor: Micron Technology
- Valuation: $600,200
- Fee: $147.01 paid to City of Boise, Idaho
- Parcel #: S1607120701
- Permit #: MEC00-04244
Nov 3, 2000
Description: Micron building #36 two story office sections b, c & d t. i. (pcs 36-20003157) to construct the tenant improvment for occupancy. this is a 216,000 sq. ft., two story office building with a 2100 sq. ft. basement building that will contain offices, conference rooms, i. s. machine room, logistics & comp. lab, mal lab, signal integrity/module lab, testers, asrl lab and ups and battery rooms at the the basement. this t. i. is being done within a new shell building constructed under permit bld00-01726. all construction per the approved plans and attached comment list. this building is divided by two two-hour area separation walls. this building fully fire sprinkled. the sprinklers are used for area increase. drh00-00072/pc#597-00/jcm
- Contractor: Micron Technology
- Valuation: $1,470,000,000
- Fee: $125,436.98 paid to City of Boise, Idaho
- Parcel #: R3466000020
- Permit #: BLD00-02159
Nov 3, 2000
Description: Micron building #36 cafeteria t.i. (pcs36-20003157)-construct the tenant improvement to finish this building for occupancy. this is a 33,700 sq. ft. building that will contain a cafeteria, servery, kitchen, shipping & receiving area, main electrical room and a training room. this tenant improvement is being done within a new shell building done under permit bld00-01980. all construction per the approve plans and attached comment list. this building is fully fire sprinkled. sprinklers are used for area increase. drh00-00072/pc#596-00/jcm
- Contractor: Micron Technology
- Valuation: $220,000,000
- Fee: $19,325.73 paid to City of Boise, Idaho
- Parcel #: R3466000020
- Permit #: BLD00-02158
Oct 17, 2000
Description: Bldg 17 west access road $43,447.00 initial cert aml
- Contractor: Micron Technology
- Valuation: $8,358,300
- Fee: $579.51 paid to City of Boise, Idaho
- Parcel #: R3466000020
- Permit #: ELE00-04006
Oct 13, 2000
Description: Micron (mic 20003141) building 24d and 24e * shell package for fab(b24d) and lab(b24e) to build a two story with basement and subfab shell building constructed of concrete foundation and floors with a steel structural frame and metal roof deck and metal stud exterior wall construction. this building is an addition to the south side of existing building #24. building #24d is separated from building #24 and building #24e by four-hour area separation walls. building #24d consists of a 36,635 sq. ft. basement, a 50,350 sq. ft. subfabrication area, a 52,000 sq. ft. first story fabrication area and a 47,000 sq. ft. second story unoccuppied fan deck. this building also contains an interstitial catwalk level between the fab and fan deck levels. building #24e consists of a 19,200 sq. ft. basement level and a 24,100 sq. ft. first floor level. these buildings are fully fire sprinkled. the sprinklers are being used for area increase. this is a shell permit only. no occupancy is allowed under this permit. a separate tenant improvement permit will be required to finish this building for occupancy. building #24d is allowed to be over the allowable area prescribed by the 1997 ubc by way ofan alternate report prepared by schirmer engineering, dated july 5, 2000 and approved by timothy hogland in an approval letter dated august 7, 2000. all construction per the approved plans and attached comment list. drh00-00072 /pc#557-00/jcm
- Contractor: Micron Technology
- Valuation: $138,437,600
- Fee: $12,407.28 paid to City of Boise, Idaho
- Parcel #: R3466000020
- Permit #: BLD00-01988
Oct 3, 2000
Description: Micron building 21-remodel for qa/aql (pcs 01-21-20003516) to remove and relocate the exit door at corridor common wall, infill door with partition at wall along grid line m, construct an interior partition along grid line n and to finish interior space with suspended ceiling between grid lines m&n and 4.5&6.5 to create a new aql room 107a and between grid lines k&n and 6.5&9 to create a new qa room 107c. all construction per the approved plans and attached comment list. pc#744-00/jcm
- Valuation: $15,154,200
- Fee: $1,940.46 paid to City of Boise, Idaho
- Parcel #: R3466000020
- Permit #: BLD00-02751
Sep 26, 2000
Description: F1, remodel south end of bay 5 $3,783.00 initial cert aml
- Contractor: Micron Technology
- Valuation: $7,678,600
- Fee: $544.34 paid to City of Boise, Idaho
- Parcel #: R3466000020
- Permit #: ELE00-03764
Sep 26, 2000
Description: Site blanket electrical permit for august '00. see attached in mike kinnear's box
- Contractor: Micron Technology
- Valuation: $46,713,400
- Fee: $2,564.39 paid to City of Boise, Idaho
- Parcel #: R3466000020
- Permit #: ELE00-03758
Sep 21, 2000
Description: Site blank electrical permit for july-00. see attached $388,299.00 initial cert aml
- Contractor: Micron Technology
- Valuation: $38,829,900
- Fee: $2,156.42 paid to City of Boise, Idaho
- Parcel #: R3466000020
- Permit #: ELE00-03712
Sep 21, 2000
Description: Bldg 24 cmp bay 6 install bay 6 mirra $4154.00 initial cert aml
- Valuation: $415,400
- Parcel #: R3466000020
- Permit #: MEC00-02617
Sep 6, 2000
Description: Bldg 16, r&m shop, locker room remodel . rm0010, & 001q $3872.00 initial cert aml
- Contractor: Micron Technology
- Valuation: $498,600
- Fee: $114.78 paid to City of Boise, Idaho
- Parcel #: R3466000020
- Permit #: ELE00-03449
Sep 6, 2000
Description: Separate non smoking and smoking break areas in bldg 26 1st floor $188.00 initial cert aml
- Contractor: Micron Technology
- Fee: $34.94 paid to City of Boise, Idaho
- Parcel #: R3466000020
- Permit #: ELE00-03447
Sep 6, 2000
Description: Facilitate 2 additional trailers on the east side of bldg 32 $101.00 initial cert aml
- Contractor: Micron Technology
- Valuation: $32,300
- Fee: $37.74 paid to City of Boise, Idaho
- Parcel #: R3466000020
- Permit #: ELE00-03446
Aug 28, 2000
Description: Fab 1 plenum 8-facilitate teos producer apo #106 $943.00 initial cert aml
- Valuation: $225,000
- Fee: $69.35 paid to City of Boise, Idaho
- Parcel #: R3466000020
- Permit #: MEC00-02567
Aug 24, 2000
Description: Fab 1x diffusion-facilitate scrubber exhaust to abp 144 $5678.00 initial cert aml 9/25-final cert 7732.00
- Valuation: $773,200
- Fee: $182.82 paid to City of Boise, Idaho
- Parcel #: R3466000020
- Permit #: MEC00-02857
Aug 24, 2000
Description: Fab 1 plenum 8 facilitate scrubber-exhaust for new teos producer $131.00 initial cert aml 9/25-final cert 2635.00 lh
- Valuation: $263,500
- Fee: $77.31 paid to City of Boise, Idaho
- Parcel #: R3466000020
- Permit #: MEC00-02856
Aug 24, 2000
Description: Fab 1x-facilitate scrubber-exhaust to three new fusion ashers $1999.00 initial cert aml 9/25-final cert 2328.00 lh
- Valuation: $232,800
- Fee: $70.96 paid to City of Boise, Idaho
- Parcel #: R3466000020
- Permit #: MEC00-02855
Aug 24, 2000
Description: Fab 1x-facilitate scrubber and voc sehaust for tel mcln hood $3482.00 initial cert aml 9/25-final cert 6533.00
- Valuation: $653,300
- Fee: $158.00 paid to City of Boise, Idaho
- Parcel #: R3466000020
- Permit #: MEC00-02854
Aug 24, 2000
Description: Fab1x plenum 7x facilitate scrubber exhaust for new rip centura $2580.00 initial cert aml 9/25-final cert. 3271.00
- Valuation: $327,100
- Fee: $90.48 paid to City of Boise, Idaho
- Parcel #: R3466000020
- Permit #: MEC00-02853
Aug 17, 2000
Description: 8/15/00*$1,300.00-reroute drain and water lines in build 16 basement-final cert. of value.mps
- Contractor: Micron Technology
- Valuation: $130,000
- Fee: $49.68 paid to City of Boise, Idaho
- Parcel #: R3466000020
- Permit #: PLM00-02932
Aug 15, 2000
Description: 8/15/00$6,415.00-building 16-basement/encap-provide labor and material to modify hvac system per drawings-final cert. of value.mps
- Valuation: $641,500
- Fee: $155.56 paid to City of Boise, Idaho
- Parcel #: R3466000020
- Permit #: MEC00-02768
Aug 8, 2000
Description: 8/4/00-bldg 24 backgrind-facilitate the scrubber exhaust to the 705 backgrinder-initial cert. of value.al
- Valuation: $1,304,000
- Fee: $292.70 paid to City of Boise, Idaho
- Parcel #: R3466000020
- Permit #: MEC00-02618
Aug 4, 2000
Description: Site blank electrical permit for june '00 $302,751.00 initial cert aml
- Contractor: Micron Technology
- Valuation: $30,275,100
- Fee: $1,713.71 paid to City of Boise, Idaho
- Parcel #: R3466000020
- Permit #: ELE00-03016
Aug 4, 2000
Description: Bldhg24 implant 1 remove implanters and remodel high current bay $18110.00 initial cert aml
- Valuation: $2,082,700
- Fee: $453.89 paid to City of Boise, Idaho
- Parcel #: R3466000020
- Permit #: MEC00-02624
Aug 4, 2000
Description: Bldg 24 install the nutool in f4 x 4" scrubber exhaust $5775.00 initial cert aml
- Valuation: $667,900
- Fee: $161.03 paid to City of Boise, Idaho
- Parcel #: R3466000020
- Permit #: MEC00-02623
Aug 4, 2000
Description: Bldg 24 cmp install bay 6 bettcher semi auto hood $5290.00 initial cert aml
- Valuation: $630,000
- Fee: $153.18 paid to City of Boise, Idaho
- Parcel #: R3466000020
- Permit #: MEC00-02622
8000 Federal Way Fire Incident History
To date, we have no information about fire incidents in 2025
08 Mar 2019
Natural vegetation fire, other
Property Use —
Manufacturing, processing
Area of Origin —
Open area - outside; included are farmland, field
First Ignition —
Heavy vegetation - not crop, including trees
16 Aug 2018
Building fires
Property Use —
Manufacturing, processing
Area of Origin —
Wall surface: exterior
First Ignition —
Pipe, duct, conduit or hose
Heat Source —
Spark, ember or flame from operating equipment
02 Jul 2018
Building fires
Property Use —
Electrical distribution
Area of Origin —
Switchgear area, transformer vault
First Ignition —
Electrical wire, cable insulation
Heat Source —
Heat from powered equipment, other
10 Dec 2016
Outside equipment fire
Property Use —
Vehicle parking area
Area of Origin —
Construction/renovation area
First Ignition —
Item First Ignited, Other
Heat Source —
Heat source: other
Federal Way Fire Incident History
To date, we have no information about fire incidents in 2025
17 Dec 2019
Outside rubbish, trash or waste fire
Property Use —
Motor vehicle or boat sales, services, repair
Area of Origin —
Vacant structural area
First Ignition —
Rubbish, trash, or waste
Heat Source —
Match
10 Nov 2019
Passenger vehicle fire
Property Use —
Vehicle parking area
Area of Origin —
Vehicle area, other
First Ignition —
Electrical wire, cable insulation
Heat Source —
Arcing
15 Jul 2019
Building fires
Property Use —
Food and beverage sales, grocery store
Area of Origin —
Wall surface: exterior
First Ignition —
Exterior wall covering or finish
08 Mar 2019
Natural vegetation fire, other
Property Use —
Manufacturing, processing
Area of Origin —
Open area - outside; included are farmland, field
First Ignition —
Heavy vegetation - not crop, including trees
8000 Federal Way incidents registered in FEMA
(Federal Emergency Management Agency)
To date, we have no information about incidents registered in FEMA in 2025
24 Jul 2012
Brush, or brush and grass mixture fire
Property Use —
Open land or field
30 Jun 2011
Brush, or brush and grass mixture fire
Property Use —
Vacant lot
20 Jun 2009
Arcing, shorted electrical equipment
Property Use —
Manufacturing, processing
21 Jul 2004
Grass fire
Property Use —
Vacant lot
Federal Way Incidents registered in FEMA
(Federal Emergency Management Agency)
To date, we have no information about incidents registered in FEMA in 2025
31 Dec 2015
Arcing, shorted electrical equipment
Property Use —
Manufacturing, processing
10 Jul 2015
Vehicle accident, general cleanup
Property Use —
Graded and cared-for plots of land
23 Jun 2015
Building or structure weakened or collapsed
Property Use —
Multifamily dwellings
23 Jan 2015
Unauthorized burning
Property Use —
Multifamily dwellings
Properties Nearby
Street Address | Residens/Landlords | |
---|---|---|
1693 Federal Way, Boise, ID 83705-3179 Single-Family Home
|
Ammophotog, ASSISTED LEGAL FORMS, LLC | |
1709 Federal Way, Boise, ID 83705-3164 Single-Family Home
|
ADA County Locksmith, Mackenzie Brown | |
1717 Federal Way, Boise, ID 83705-3164 Single Family
|
Juanita C Barton, Jc Burton | |
1723 Federal Way, Boise, ID 83705-3164 Single Family
|
A TO Z INSTALLERS, Richard Scott Boole | |
1729 Federal Way, Boise, ID 83705-3164 Single-Family Home
|
Donna M Harmon, Darrell E Leatham | |
1819 Federal Way, Boise, ID 83705-4261 Single Family
|
Guy K Carver, Mikele E Castro | |
1901 Federal Way, Boise, ID 83705-4262 Single-Family Home
|
Mary Bollard, John C Oliver | |
3960 Federal Way, Boise, ID 83716-5226 Townhouse
|
Monterra, Quantum Residential, Inc | |
4540 Federal Way, Boise, ID 83716-5529 Mobile/Manufactured |
HACKWELL CORPORATION, Leisure Industries Inc |